What we do

Identify, assess and mitigate technical, financial, contractual, permitting and integration risks in complex clean energy projects.

Energy transition projects face risk across technology, contracts, permitting, financing, interfaces and project delivery. We make those risks visible early, assess them systematically and turn them into clear mitigation actions so teams can move from reactive problem-solving to proactive control.

Our role is to create enough clarity for decision makers to commit resources, align stakeholders and move the project into its next stage with a stronger evidence base.

Service scope

Focused support for complex clean energy decisions.

Risk Assessment

Identify and assess project risks at the outset or refresh an existing risk picture as the project evolves.

Risk Mitigation

Define practical mitigation measures and support their implementation and ownership.

Multi-Dimensional Risk

Cover technical, design, safety, integration, financial, contractual and permitting risks in one framework.

References

Relevant project experience.

The reference projects below integrate the detailed scope and key facts previously presented in the project modals of the CRATOS CAN Clean Energy site.

Diagram for Large Hydrogen Hub

Reference Project

Large Hydrogen Hub

Project Summary

  • Complex hydrogen network spanning production, transport and end use
  • Consortium structure and delivery interfaces managed across many participating organizations

Scope

  • Project management and integration
  • Consortium and stakeholder management
  • Hydrogen advisory

Key Facts

  • Electrolyzer: 12 MW; 300 MW planned in Phase 2
  • Hydrogen: approx. 3.5 t/day
  • CAPEX: approx. €30 M in Phase 1
Diagram for Green Hydrogen Production Plant for an Indigenous-Led Project

Reference Project

Green Hydrogen Production Plant for an Indigenous-Led Project

Project Summary

  • British Columbia development integrating technical, commercial, financing and stakeholder considerations
  • Risk management embedded directly in project financing and engineering work

Scope

  • Project management and consortium establishment
  • Offtake development
  • Project-financing facilitation and risk management
  • Electrolyzer integration engineering

Key Facts

  • Electrolyzer: 25 MW
  • Hydrogen: 10 t/day
  • CAPEX: approx. CAD 125 M
Diagram for Energy Autonomy Concept for Graciosa, Azores

Reference Project

Energy Autonomy Concept for Graciosa, Azores

Project Summary

  • Island energy-transition concept focused on reducing imports and increasing self-sufficiency
  • Strategy aligned local conditions with wider government energy-transition objectives

Scope

  • Feasibility study
  • Stakeholder analysis
  • Energy-system analysis and forecasting
  • Financial-impact evaluation

Key Facts

  • Electrical capacity: 4.6 MW
  • Energy consumption: 14 GWh/year
  • Applications: grid, transport and commercial users
Portrait of Justin Cao

Your contact in Canada

Justin Cao

Hydrogen Engineering Consultant

Discuss your project directly with the CRATOS CAN Clean Energy team.

Contact the team
Let’s connect Have a project or question in mind? Choose a time that works for you.